Verification · 8 min
Post-installation water-treatment verification checklist
How and when to test after installing filters, RO or private-well UV so you can confirm performance instead of assuming it.
- Author
- WaterFilterHelp Editorial Team
- Canadian home-water research and consumer education
- Reviewed by
- WaterFilterHelp Standards Review
- Fact-checked against official Canadian guidance and certification sources
- Last reviewed
- 2026-08-23
Looking for a lab or free test option? Find a Water Test · Already have results? Explain your water test · Not sure which system you need? Run the Water Problem Wizard.
Before installation
Keep the accredited raw-water report used for system design. Record the sample point, date, units, detection limits and operating conditions. Confirm each proposed device has the exact certification claim needed for the target contaminant.
Commissioning day
Have the installer flush and sanitize the system according to the manufacturer’s instructions. Record model and serial numbers, media, flow settings, pressure, bypass position and the maintenance schedule.
Initial verification
After the specified flush or conditioning period, use an accredited laboratory to collect paired raw and treated samples for the target health-related contaminants. Use the same units and comparable analytical method. A handheld TDS meter can help monitor an RO trend but cannot prove removal of PFAS, lead, arsenic, uranium or microorganisms.
UV systems on private wells
Test for total coliforms and E. coli after commissioning and after corrective work. UV performance also depends on pretreatment, UV transmittance, flow, lamp age and a clean quartz sleeve. A lighted lamp is not proof of disinfection.
Ongoing verification
Retest on the schedule advised by your public-health authority and whenever water changes, flooding or well work occurs, equipment alarms, media is exhausted, or treatment is serviced. Keep results with maintenance records so trends are visible.